Dedicated to strict top quality command and considerate purchaser support, our experienced staff customers are always available to discuss your necessities and be certain full client gratification for Auto Part Mold, High Precision Metal Progressive Die, Aluminium Stamping, In addition, we would properly guide the customers about the application techniques to adopt our products and the way to select appropriate materials.
Factory source Casting Mold - Plastic Injection Parts – Ruicheng Detail:
Project Analysis:
After receiving 3d drawings and requirements from customers, our engineer team will evaluate its structures and dimensions to discuss and consider how to design the mold ( such as the injection gate, pins, draft angle etc.)
Production Process:
1. Clamping:
The tool closes, signifying the start of the injection molding cycle.
2. Injection:
The polymer granules are first dried and placed in the hopper, then they are fed into the barrel, where they are simultaneously heated, mixed and moved towards the mold by a variable pitch screw. The geometry of the screw and the barrel are optimized to help build up the pressure to the correct levels and melt the material.
3. Cooling:
After the tool cavity is filled, the resin must be allowed to cool. Water is cycled through the tool to maintain a consistent temperature while the material hardens.
4. Ejection
As the material cools down, it re-solidifies and takes the shape of the mold. Finally, the mold opens and the solid part is pushed out by the ejector pins. The mold then closes and the process repeats.
5. Package
The finished products will be packed by using plastic bag and put into cartons. Special packaging requirements, can also be customized according to the needs of customers .So that every product will be delivered in the good condition.
Product detail pictures:
Related Product Guide:
Our company puts emphasis on the management, the introduction of talented personnel, and the construction of staff building, trying hard to improve the quality and liability consciousness of staff members. Our company successfully attained IS9001 Certification and European CE Certification of Factory source Casting Mold - Plastic Injection Parts – Ruicheng , The product will supply to all over the world, such as: Russia, Naples, New Zealand, Based on our automatic production line, steady material purchase channel and quick subcontract systems have been built in mainland China to meet customer's wider and higher requirement in recent years. We are looking forward to cooperating with more clients worldwide for common development and mutual benefit!Your trust and approval are the best reward for our efforts. Keeping honest, innovative and efficient, we sincerely expect that we can be business partners to create our brilliant future!